a a a a a a a a a a
4. Sludge Dryer | ANT 21
logo
 4. Sludge Dryer 4. Sludge Dryer 4. Sludge Dryer

4. Sludge Dryer

 4. Sludge Dryer
① Sludge Pellet Dryer (Hot Air Heating) System

Sludge Pellet Dryer (Hot Air Heating) System

Benefits and the Disposal Plans

- Simple design and cost effective
- Easy installation and the facility size can
be easily changed in relation to the
amount of sludge being treated
- Easy maintenance and convenient operation.
- The automated system allows real-time
monitoring and central control

How to deal with dried sludge

Can be used bot as auxiliary fuel and resource
material by the power plants and the cement
manufacturers.
- Low Cost
- High Efficiency
- High Quality
- MY SRF

INPUT/SUPPLY SYSTEM FOR DEWATERED SLUDGE

Process

Sludge Input-->Storage in storage tank-->
Spraying odor removing agent --> Sludge discharge

Applied design
• Storagetank capacity: 100ton
• Spraying odor removing agent: Liquid phasespraying
• Shipmentof dewatered sludge: By conveyor

Plan

• Sludge Input: By vehicle
• Measurementof imports: By unmanned
metering equipment
• Application of automatic vehicle detection
system: Interlocked control of sludge-inlet
andsludge-outlet with loop coil
• 3-fold closed structure: High-speed electric
shutter + air curtain + Sludge-inlet.

GRINDER/MIXER FOR DEWATERED SLUDGE

Process
• Input of dewatered sludge-->
Grinding and mixing of sludge -->
Sludge discharge

Applied design
• Sludge hopper : Storage of precise amount
of sludge using the sensor
• Sludge supplier: Interlocked operation by
the precise amount of sludge
• Sludgegrinder : Optimized grinding of sludge mixture
• Mixing and shipping system: Pedaled structure

Plan
• Sludge hopper : Using equipmentthat can
store precise amount of dewatered sludge
• Mixingandshipping system: Supply of sludge
to pellet molder using facile mixing and shipping system.

PELLET MOLDER

Process
• Import of sludgemixture -->
Sludge pellet molder--> Sludge discharge

Applied design
• Sludge hopper : Storage of precise amount
of sludge using the sensor
• Sludge supplier: Interlocked operation by
the precise amount of sludge
• Pellet molder : Molding the screw-shaped pellet.

Plan

• Sludge hopper : Using equipmentthat can
store precise amount of dewatered sludge
• Pelletmolder: Improvingthe dewatering
efficiency with proper distribution of pressure
after the molding.

DEWATERING MACHINE

Process
• Pellet-molded sludge injection-->
Supply of precise amount of sludge into
dewatering machine--> Sludge discharge

Applied design
• Pellet-moldedsludge hopper : Storage of
precise amount of sludge using the sensor
• Sludge supplier: Interlocked operation by
the precise amount of sludge
• Dewatering machine: Conveyor belts with
adjustable feedrateby floor

Plan
• Pellet-moldedsludge hopper : Using equipment.
that can store precise amount of pellet-molded sludge
• Dewateringmachine: Conveyor belts with
adjustable feedrateby floor (Maintaining the
constant temperature and water discharge).

Learn More
② Sludge Dryer
(Sludge Fry-Drying System)

♧ Fry-Drying System ?

■ Process description

1. Sludge Storage Tank & feeding system.
- Sludge in the store tank is transferred to the reactor
with a pump or screw conveyor.

2. Reactor ( dryer).
- The sludge charged into the reactor is dispersed in the hot
oil by a high speed agitator (Temp: 130-150C).
-The moisture in the sludge is evaporated by the hot oil and
the moisture is turns into steam.
-The sludge whose moisture has been removed is discharge
to the outside by the conveyor.

3. Screen system.
- Fried sludge in the oil is seperated by oil and sludge in
the vibrator screen.

4. Pressing Unit.
-After screening, remove any remaining oil from sludge by pressing.

5. Condensing unit.
-when the moisture in the sludge becomes vapor and exits
to the outside, it is condensed by the heat exchanger.

6. Deodor Unit
- A trace amount of gas that can nit be condensed is
removed from the odor preventation facility.

7. Condensing Tank.
- The condensate removed from the heat excharger is sent
to the existing waste water treatment plant.

8. Oil Circulation Tank.
- After passing the screen, the oil is brought back into the reactor.


Learn More
Gading Bukit Indah Blok H No.18
Kelapa Gading, Jakarta Utara 14240 Indonesia.
Telp : (+62) 21 2245 9153
Fax : dyseo2378@gmail.com
Email : ant21.adm@gmail.com
© 2018 - ECO-ANT21 Corp All Rights Reserved,
Jasa Pembuatan Website by IKTmobile